Feature case study
Lexington Landslide
A steep hillside behind three newly constructed apartment buildings in Nashville, TN, began to show evidence of movement, resulting in the immediate evacuation and relocation of the residents from 72 units. Hayward Baker worked with the owner’s engineer to design a permanent repair scheme that included an initial installation of a soldier pile and lagging wall at the toe of the slope, augmented by two rows of anchor blocks farther up the slope. Subsurface drains installed within the slope intercepted ground water, and shallow ditches redirected surface water.
Read full case study
Look for Others