Page tools

Page tools



Imagery


Wet Soil Mixing - Mass Stabilization

100% Mass Mixing / Stabilization Process

Download (File Size: 51 KB bytes)

 

Wet Soil Mixing Tank

Wet soil mix columns constructed for planned tank foundations at the Galliano, LA site.

Download (File Size: 54 KB bytes)

 

Wet Soil Mixing Plant

Wet soil mix columns constructed to support ethanol tanks and grain handling structures, and vibro replacement stone columns to increase global bearing support and mitigate the liquefaction hazard, for a new ethanol plant in Stockton, CA.

Download (File Size: 42 KB bytes)

 

Wet Soil Mixing Earth Retention

Soil mix column retaining wall was constructed within one foot of a reclaimed water line to facilitate construction of a new turning lane near a strip mall in Davenport, FL.

Download (File Size: 44 KB bytes)

 

Wet Soil Mixing Building Residential

Wet soil mix columns for temporary excavation support and permanent lateral spreading barrier, and vibro replacement stone columns for liquefaction and lateral spreading mitigation, for planned apartment buildings in Marina Del Rey, CA.

Download (File Size: 74 KB bytes)

 

Hayward Baker Acquires Geo-Foundations Contractors

Hayward Baker Acquires Geo-Foundations Contractors Learn more
The [emergency repair to Geiger slope] was a time sensitive project that prevented the potential for further environmental impact and further slope failure. Hayward Baker quickly and expertly provided the Government with a design solution and constructed the solution on time and within budget. - Peter Benson, Ensign U.S. Navy AROICC
Department of the Navy