Page tools

Page tools



Imagery


Chemical Grouting Plant

Chemical grouting for groundwater control and excavation support at a header pipe and electrical duct banks for an addition at the East Central Regional Waste Water Treatment Plant in West Palm Beach, FL.

Download (File Size: 98 KB bytes)

 

Chemical Grouting Building Commercial

Chemical grouting for underpinning and excavation support of an existing restaurant immediately adjacent to a planned 5-story office condo in Boca Raton, FL.

Download (File Size: 104 KB bytes)

 

Chemical Grouting Tunnel

A chemically grouted break-out for an tunnel access shaft for construction of twin subway tunnels at the LACMTA Eastside Extension (Goldline) project in Los Angeles, CA.

Download (File Size: 64 KB bytes)

 

Hayward Baker Ranked #1 by Engineering News-Record (ENR)

#1 Foundation Contractor Learn more
Hayward Baker consistently performs in an outstanding manner in all aspects of construction contracting with the Corps Memphis District. The Quality Control system is a very effective forward-thinking team than can resolve issues before they cause delays to the work. - Linda G. Boyd, Acting Chief, Con-Ops Division
U.S. Army Corps of Engineers - Memphis District