Please get the flash player installed.

Get Adobe Flash player

Page tools

Page tools

Grouting

Hayward Baker's grouting systems solve a variety of geotechnical issues for new and remedial construction. Grouting techniques can cutoff groundwater, strengthen soft in situ soils for tunneling support, remediate settlement of structures caused by soft ground tunneling, underpin structures, densify granular soils for liquefaction mitigation, construct or repair retaining walls, construct access shafts, to name a few applications. Hayward Baker is responsible for introducing chemical grouting to the U.S. market, where it was first used in the construction of the Baltimore and D.C. subways.

2017 Calendars are available!

Make sure you are on the list! Learn more
Hayward Baker consistently performs in an outstanding manner in all aspects of construction contracting with the Corps Memphis District. The Quality Control system is a very effective forward-thinking team than can resolve issues before they cause delays to the work. - Linda G. Boyd, Acting Chief, Con-Ops Division
U.S. Army Corps of Engineers - Memphis District