Hayward Baker provided the client with an on-time turnkey solution for a deep, large area excavation adjacent to the ocean with design-build excavation support, groundwater control and deep foundations.

The Project

A 28-story residential high-rise planned for construction on Miami Beach included a 3-story below-grade parking garage. The area of the excavation footprint was 107,000 square feet and the excavation depth reached 40 feet below grade.

The Challenge

The 40-foot deep basement excavation was 34 feet below sea level, posing the significant challenge of controlling groundwater inflow, especially due to the native porous oolitic limestone.

The Solution

Hayward Baker solved the groundwater control challenge by using deep soil mixing to create a seepage barrier along the perimeter and base of the excavation.  The perimeter soil mix columns also provided excavation support as they were reinforced with steel H-piles and laterally restrained with tieback anchors or internal bracing. HJ Foundation designed and installed large-diameter augercast piles as deep as 85 feet below the excavation to support the structural loads and act as tiedown anchors for resisting the hydrostatic uplift on the soilcrete bottom slab.

Your team creates very dry holes; extremely dry holes. This is based on my experiences at the Oceana Bal Harbour and Armani projects.

John Mills, VP of Operations, Coastal Construction

Project Facts

Owner

Consultatio Real Estate

Main Contractor(s)

Coastal Construction

Keller Business Unit(s)

Hayward Baker
HJ Foundation

Engineer

NV5