| Jacked Piers |
 |
- Provide for a two-stage system of
initially hydraulically pushing the manufactured piers to
load bearing support, then using hydraulic jacks, lifting
the structure to the desired elevation.
|
- Design should involve professional
engineering input.
- Specific information involving the
structures, soil characteristics and foundation conditions
must be considered in determining the final design.
|
- Settlement remediation for structures
of all types for loads up to 100 kips per pier.
- Stabilization of existing structures.
- Underpinning.
|
- Each pier is manufactured in a state-of-the-art
fabricating facility. With rigid quality control, consistent
quality is assured.
- Because
each pier is installed with a hydraulic jack of known area
and pressure, the load on the pier is monitored at all times.
In effect, each pier is tested as it is installed.
|
- Fast installation.
- No vibration, no noise.
- Easy installation in limited access
areas.
- Minimum disturbance to site.
- Immediate loading.
- Equipment portability.
- On-site load test performed on every
installed pier.
- Enhanced factor of safety available
through optional helical outriggers for supplemental drive
resistance.
- No drill spoil or waste. Very clean
procedure.
|
|